About This Lesson
Use the information to cost the building of a swimming pool. Incorporate genuine values for costs of hire and labor; so the the results should be fairly accurate.
Share
Share
Share
Use the information to cost the building of a swimming pool. Incorporate genuine values for costs of hire and labor; so the the results should be fairly accurate.
I used this activity with my year 10. We found that all answers are correct up to the question with number of tiles needed; our answer was 355000 tiles not 375000!
This generated a lot of questions and working out.